Skip to content
Friday, 27 November 2026 | DMRC Helpline: 155370
Gurgaon Metro Rail Gurugram Metro Guide & Jobs
Updates
Delhi Metro fares revised from 25 Aug 2025 — weekday fares now ₹11 to ₹64Gurugram Metro Phase 2 (Sector 9 – Cyber City) ₹1,662 crore civil package clearedChange between Yellow Line and Rapid Metro at SikanderpurHUDA City Centre is now Millennium City Centre GurugramDelhi Metro fares revised from 25 Aug 2025 — weekday fares now ₹11 to ₹64Gurugram Metro Phase 2 (Sector 9 – Cyber City) ₹1,662 crore civil package clearedChange between Yellow Line and Rapid Metro at SikanderpurHUDA City Centre is now Millennium City Centre Gurugram
Metro Projects

Dwarka Expressway Metro: What the Sector 101 Spur Means for Gurugram Residents

November 17, 2026 · admin · 4 min read

Dwarka Expressway Metro: What the Sector 101 Spur Means for Gurugram Residents

Dwarka Expressway has changed faster than almost any other part of NCR. Ten years ago it was a half-built road with a few scattered projects. Today it is lined with high-rise societies, and thousands of families have moved in. What it still does not have is a metro.

That is set to change with the new Gurugram Metro. As part of Phase 1, a short spur line will connect the main corridor to Sector 101 on Dwarka Expressway. It is only about 1.85 km long, but for residents of the area it is easily one of the most important pieces of the whole project.

The spur at a glance

DetailInformation
——
RouteBasai Village to Sector 101, Dwarka Expressway
LengthAbout 1.85 km
Part ofGurugram Metro Phase 1
Built byGurugram Metro Rail Limited (GMRL)
ContractorDilip Buildcon–RBL joint venture (Phase 1 package)
TargetAlong with Phase 1, targeted for 2028

How the spur connects

The main Gurugram Metro corridor runs from Millennium City Centre through Sectors 45–48, Subhash Chowk, Hero Honda Chowk, Sector 10 and Sector 37 to Basai Village, and then on to Sector 9 and Old Gurugram.

At Basai, the spur branches off towards Sector 101 on Dwarka Expressway. This gives Dwarka Expressway residents a direct link into the main corridor, and from there to:

  • Millennium City Centre for the Yellow Line to Delhi
  • Hero Honda Chowk, where a Namo Bharat (RRTS) interchange is proposed
  • Old Gurugram, Palam Vihar and Cyber City once Phase 2 is complete

Why it matters

For residents Right now, getting from a Dwarka Expressway society to a metro station usually means driving or taking a cab to Millennium City Centre or to a Delhi Metro station in Dwarka. Both can take a long time in peak traffic. A metro station at Sector 101 would put the network within a short ride for a large number of homes.

For office commuters People who live on Dwarka Expressway and work in Udyog Vihar, Cyber City or along Golf Course Road could, in time, make most of their commute by metro instead of by road.

For homebuyers Metro access has a clear effect on property demand, and projects near future stations often see stronger interest. If you are buying on Dwarka Expressway, it is worth checking how far the project is from Sector 101 and from Basai. Keep in mind that metro timelines can slip, so it is wise not to base a purchase only on the expected opening date.

Is there a direct metro to Dwarka in Delhi?

Not as part of this project. There has been a long-discussed proposal to link Palam Vihar with Dwarka Sector 21 in Delhi, which would connect Gurugram to the Delhi Metro’s Blue Line and Airport Express Line. That remains a proposal, separate from the current Gurugram Metro construction. We will cover it in more detail if it moves forward.

How the spur compares with other planned links

Gurugram has several metro and rail projects in the pipeline, and it is easy to mix them up. Here is a quick way to keep them apart:

ProjectWhat it connectsStatus
———
Sector 101 spurBasai to Dwarka ExpresswayPart of Phase 1, under construction
Gurugram Metro Phase 2Sector 9 to Cyber CityTender stage
Gurugram railway station spurMain corridor to Gurugram railway stationSeparate project
Sector 56 to PanchgaonGolf Course Road to ManesarPlanning / DPR stage
Palam Vihar to Dwarka Sector 21Gurugram to Delhi Metro Blue LineProposal

Of these, the Sector 101 spur is the most advanced, because it is already part of a contract under construction.

Construction status

The spur is part of the Phase 1 civil package awarded in 2025. By October 2026, Phase 1 as a whole had reached about 15% physical progress, with most work concentrated around the Millennium City Centre – Sector 45 – Subhash Chowk stretch. Work on the Basai and Sector 101 end will become more visible as the project moves west. Read our Phase 1 construction update for the latest.

What to expect until then

  • Traffic diversions near Basai and on the approach to Dwarka Expressway as work begins in this area
  • Changes to service lanes around construction sites
  • Better last-mile options later: once the station opens, autos, e-rickshaws and buses typically reorganise around it

Related guides

FAQs

Is Dwarka Expressway getting a metro? Yes. A 1.85 km spur from Basai Village to Sector 101 on Dwarka Expressway is part of the new Gurugram Metro’s Phase 1.

When will the Dwarka Expressway metro open? It is part of Phase 1, which is targeted for 2028.

Will the spur connect to the Delhi Metro? Indirectly. It joins the Gurugram Metro corridor, which connects to the Delhi Metro Yellow Line at Millennium City Centre.

For the complete route, see our Gurugram Metro route and station list.

Official sources: Official project updates and tenders are published by Gurugram Metro Rail Limited (GMRL).

Information may change. Please verify timings and fares with the official operator before travelling.

Leave a Reply

Your email address will not be published. Required fields are marked *